The Pink Signal · Issue 1 · Q4 2026 · Research reported as of November 2, 2026

What the market is telling you for your fall planning

A quarterly market scan for AEC firm leaders, from The Flamingo Project.

From Sarah's Desk

This is the first issue of The Pink Signal. I'm excited to put forward the work we have been doing in the background to streamline insights for firms.

This is not custom to your company, your strategy, or the opportunity ahead of you. Our goal is to give you a scorecard that aggregates the resources out there with our own, to help you navigate planning season.

Every reading here is our analysis of secondary research sources, named and dated at the bottom of this issue. We do not survey firms and we do not collect primary data for this issue.

We read what the publishers put out, we say where they agree and where they diverge, and we tell you what we think it means for design work and for construction work.

Sarah

What the labels mean

The labels

  • Growing Flat Declining Mixed
    The direction of a sector. Mixed means the parts are moving in different directions, or one region is moving while another is not.
  • Design Construction
    Two separate reads on the same sector. Design is the work architects and engineers are hired to do. Construction is what is being built and paid for.
  • AGREE DIVERGE MIXED
    Whether the sources point the same way. AGREE means they do. DIVERGE means 2 sources measuring the same work over the same period point opposite ways. MIXED means they point different ways, or one of them publishes no reading.
01Economic Conditions

Labor

Design
  • AIA puts the national project backlog at 6.2 months at the end of the third quarter, down from 6.6 at the end of the first
  • Institutional-specialist firms stay at 8.0 months and large firms billing $5M or more stay at 8.1
  • Multifamily-specialist firms fell from 6.2 months in March to 4.8 in September

What it means: Backlog decides who can keep a team. Institutional firms can. Multifamily firms cannot.

Construction

There are more construction jobs open right now than people to fill them.

  • Openings rose 18% to 251,000 while the hires rate fell to 3.7% in August, the lowest August in the 26 years of the Bureau of Labor Statistics Job Openings and Labor Turnover Survey
  • Firms are not letting people go either. The layoff rate dropped from 2.2% to 1.2%
  • Nonresidential and heavy work added 142,000 jobs over twelve months while residential lost 32,800
  • Crews cost $39.20 an hour, up 4.3% while the whole private sector moved 3.3%
  • The Federal Reserve's October 14, 2026 Beige Book calls labor supply generally adequate and then names skilled trades as the shortage that persists

The sectors marked growing below are bidding for the same crews.

AGC and NCCER surveyed contractors in July and August 2026.

  • 42% report that shortages of their own or their subcontractors' workers delayed projects, down from 45% a year earlier
  • 88% of firms with craft openings say those positions are as hard or harder to fill than a year ago
  • 73% expect to add employees over the next 12 months while 8% expect to reduce
  • 28% performed data center work in the past 12 months. Among firms reporting the effects, 58% cite increased competition for skilled workers and 49% cite wage pressure

What it means: Your competitors are struggling to find the talent just as much as you are. This is a bidding and price situation for projects.

The economy and the cost of money

The Federal Reserve is tightening into a soft construction market.

  • The Fed raised the federal funds target range to 3.75% to 4.00% on September 16, 2026, a quarter point, and said inflation remains elevated
  • In the Beige Book published October 14, 2026, Chicago has construction and real estate activity declining slightly and San Francisco has residential real estate weakening
  • 3 of the 12 districts report no significant change in activity at all
  • Higher oil prices reached every one of the 12 district reports, and 4 districts said price increases picked up

Money is getting more expensive while the work is getting harder to find.

Design
  • A rising policy rate raises the hurdle rate on every private deal
  • AIA chief economist Richard Branch names a soft economy, challenging project financing and growing caution among clients
  • The regional Architecture Billings Index reads the same way: Northeast 39.1 and South 43.1 in September 2026, with West 50.7 and Midwest 50.6 above 50

What it means: Private deals get harder. Public ones do not.

Construction

The 3 cost indexes agree.

  • Rider Levett Bucknall has its national index at 292.28 in July 2026, up 1.28% in the quarter and 4.45% over the year, the largest single-quarter move in 2 years
  • Turner puts its index at 1575 in the third quarter, up 1.48%
  • Mortenson has costs up 1.58% in the quarter and 5.60% over 12 months, led by electrical systems at 3.4% and structural steel and metal decking at 3.2%

What it means: Costs are rising faster than financing is loosening.

02The Regions

How we cut the country

This issue is a market scan, reported as of November 2, 2026: 13 sectors read across the 4 Census regions. The region by region read is at the bottom of the issue.

Alaska, WestAlabama, SouthArkansas, SouthArizona, WestCalifornia, WestColorado, WestConnecticut, NortheastDistrict of Columbia, SouthDelaware, SouthFlorida, SouthGeorgia, SouthHawaii, WestIowa, MidwestIdaho, WestIllinois, MidwestIndiana, MidwestKansas, MidwestKentucky, SouthLouisiana, SouthMassachusetts, NortheastMaryland, SouthMaine, NortheastMichigan, MidwestMinnesota, MidwestMissouri, MidwestMississippi, SouthMontana, WestNorth Carolina, SouthNorth Dakota, MidwestNebraska, MidwestNew Hampshire, NortheastNew Jersey, NortheastNew Mexico, WestNevada, WestNew York, NortheastOhio, MidwestOklahoma, SouthOregon, WestPennsylvania, NortheastRhode Island, NortheastSouth Carolina, SouthSouth Dakota, MidwestTennessee, SouthTexas, SouthUtah, WestVirginia, SouthVermont, NortheastWashington, WestWisconsin, MidwestWest Virginia, SouthWyoming, WestALAKAZCOFLGAINKSMEMNNCNDOKPASDTXWYMOWVILNMARCAHIIAKYMIMSMTNYOHORTNUTVAWAWINESCIDNVLA
NortheastMidwestSouthWestShaded by Census region.
03Sector Signals

Where each sector sits, region by region

GrowingFlatDecliningMixed
Healthcare

Health systems are winning approvals faster than they are awarding the work.

Healthcare is hospital and outpatient construction, and who owns the building decides the direction.

GrowingNortheast
MixedMidwest
MixedSouth
MixedWest
DesignMixed
  • AIA institutional billings 47.6 in September 2026, up 1.5 points from August and still below the 50 that marks no change
  • Dodge has institutional planning up 17.2% year over year
  • Backlog at institutional-specialist firms stayed at 8.0 months while the national average fell to 6.2 months from 6.6 at the end of the first quarter

What it means: More is happening in planning than in design. The work is approved but not designed.

ConstructionMixed
  • Census has private health care construction down 1.7% and public health care construction up 7.5% in September 2026
  • Private health care has risen in 4 of the 5 months since its April low of $56.1B, and public health care fell 1.3% in September from its August high
  • Health systems won approval for 3 hospitals in 2026 that have not been awarded to a builder: Hartford Hospital at $950M, RWJBarnabas Tinton Falls at $858.7M, MUSC Charleston at $1.115B
  • Rider Levett Bucknall prices a general hospital between $465 and $1,250 a square foot across the 18 US cities it tracks in Q3 2026

What it means: The planning stages for design will bear fruit into the future. Until then, private and public forecasts are mixed depending on region.

Higher Education

Campuses are renewing what they have instead of building more.

Higher education is campus construction, and deferred maintenance is the largest part of it.

MixedNortheast
MixedMidwest
MixedSouth
MixedWest
DesignMixed
  • AIA institutional billings 47.6 in September 2026, up 1.5 points from August and still below the 50 that marks no change
  • Dodge has institutional planning up 17.2% year over year
  • Backlog at institutional-specialist firms stayed at 8.0 months while the national average fell to 6.2 months from 6.6 at the end of the first quarter

What it means: Renovation is the market. New capacity is not.

ConstructionMixed
  • State and local higher education construction runs at a $32.4B annual rate in September 2026, down 1.2% year over year, and all public educational construction is down 1.4%
  • Campus construction fell to $30.1B in February 2026 and recovered 7.9% by August, so the year over year figure reads flatter than the year moved
  • The renewal backlog stands at $156 a gross square foot and campuses are spending about three quarters of what it would take to stop it growing, so the backlog gets bigger every year
  • Rider Levett Bucknall prices new university construction between $435 and $1,300 a square foot across its 18 US cities in Q3 2026

What it means: Public campuses recovered their winter drop. Private campuses have not stopped falling, and deferred maintenance is still a big part of this market.

Civic and Government

Cities and states are building infrastructure and cutting civic buildings in the same budget.

This sector is state and local government: cities, counties, states and their authorities.

  • State and local construction $504.8B at an annual rate in September 2026, up 0.8% year over year and up 2.2% from the December 2025 low of $493.9B, after a 0.3% slip in September
  • State and local public office construction down 4.1% and public safety down 6.7%
  • State and local highway up 4.0% and transportation up 3.2%. Water supply sits 0.1% below September 2025 and 5.6% above its March low, and sewage and waste disposal sits 1.9% below September 2025 and 1.8% above its April low
  • Forward signal: governors proposed $1.36 trillion in FY2027 general fund spending, a 1.4% decline in aggregate, with 13 states reporting $26.3B of gaps. What each state proposes names its own priorities for the year ahead
MixedNortheast
MixedMidwest
GrowingSouth
MixedWest
DesignMixed

What it means: Highways and transit lead this sector. Water and sewer sit below a strong September 2025 and have risen since the spring, so the annual figure reads worse than the work does.

ConstructionMixed

What it means: In the South the growth is in highways and transit.

Office

Office is the recovery story of 2026, and the recovery is in the Class A market.

Owners are taking old space out of inventory faster than developers are adding new.

  • JLL reports 6.0M sq. ft. of net absorption in Q3 2026, the 5th straight positive quarter, and 21M sq. ft. year to date
  • JLL has landlord leverage expanding across Class A markets and effective rents growing fastest in trophy and new construction
  • Gateway markets lead leasing, up 13% over 12 months, while Sun Belt and tertiary markets have each run above 95% of their 2019 volume
  • Owners took 9.6M sq. ft. out of inventory in Q3 2026, and total inventory is down more than 45M sq. ft. from its late-2023 peak
  • Only 3.5M sq. ft. completed in Q3 2026, with 23M sq. ft. under construction
  • Census has office construction at a $162.3B annual rate in September 2026, up 33.4% year over year, with private office up 39.5%
  • AIA commercial and industrial billings 50.9 in September 2026, up 0.8 points and growing a 2nd month
MixedNortheast
GrowingMidwest
GrowingSouth
MixedWest
DesignMixed

What it means: The recovery is in the Class A market.

ConstructionMixed

What it means: Repositioning and removal from inventory, not new towers.

Retail

Retailers are leasing faster than developers are building.

Retail is shopping centers, malls and general retail. Marcus and Millichap puts most of the active construction in built-to-suit convenience stores and supermarkets rather than speculative centers.

  • Colliers puts national retail vacancy at 4.3% in Q3 2026, down 10 basis points and near its historic low. Shopping centers 5.4%, malls 8.2%
  • Net absorption 10.5M sq. ft., the highest quarter since 2023, on 38.4M sq. ft. of leasing
  • Asking rent $26.20 a square foot, up 0.7% in the quarter
  • 58.1M sq. ft. under construction with only 7.6M sq. ft. delivered, because construction and financing costs are holding back speculative projects
  • General retail absorbed 5.4M sq. ft., shopping centers 3.0M and malls 1.9M
  • Dallas-Fort Worth has the largest pipeline at 7.2M sq. ft., then Houston at 5.1M and Austin at 3.2M
  • Marcus and Millichap puts most of the active construction in built-to-suit convenience stores and supermarkets, and expects 32M sq. ft. of additions in 2026, 0.4% inventory growth for a 3rd straight year
FlatNortheast
FlatMidwest
GrowingSouth
FlatWest
DesignMixed

What it means: Vacancy near a historic low with little delivered. Demand is ahead of supply.

ConstructionMixed

What it means: Construction and financing costs are what limit the pipeline, not demand.

Multifamily

Developers are pulling permits and waiting to start.

Multifamily is buildings of 5 units or more.

GrowingNortheast
GrowingMidwest
DecliningSouth
MixedWest
DesignDeclining
  • AIA has multifamily residential billings at 42.9 in September 2026, the weakest sector index it publishes
  • Backlog at those firms fell from 6.2 months in March to 4.8 in September, the sharpest backlog decline in the release
  • AIA chief economist Richard Branch names a soft economy, challenging project financing and growing caution among clients

What it means: Design work is drying up here faster than anywhere else.

ConstructionMixed
  • Census has permits for buildings of 5 units or more at a 503,000 annual rate in September 2026, up 1.0% year over year
  • Starts fell 25.9% to 349,000 and completions fell 20.4% to 339,000
  • NMHC puts equity and debt availability below 50 in its July 2026 survey
  • Rider Levett Bucknall prices multifamily between $190 and $700 a square foot across its 18 US cities in Q3 2026, with its national cost index up 4.45% over the year to July

What it means: Owners are permitting and waiting. Financing is the gap between a permit and a start.

Senior Living

Operators are filling units faster than developers are adding them.

Senior living is independent living, assisted living and memory care, owned mostly by publicly traded REITs and regional operators.

GrowingNortheast
GrowingMidwest
MixedSouth
GrowingWest
DesignGrowing
  • NIC puts occupancy at 90.4% in Q3 2026 and units under construction down 1.0% to 16,159
  • Welltower reported construction in progress of $1.24B at September 30, 2026 against $512M a year earlier
  • Ventas closed $5.2B of senior housing investments through Q3 2026, and its own capital expenditure guidance of about $400M did not move

What it means: One owner is funding new buildings. The rest are buying what already exists.

ConstructionGrowing
  • NIC puts development cost at $388,830 a unit
  • Welltower spent $139.1M on recurring capital for its owned operating properties in Q3 2026 against $98.1M a year earlier
  • The 65+ population grows 11.8% from 2025 to 2030

What it means: Renovation inside buildings these owners already have is growing faster than new communities.

Manufacturing

Companies are announcing far more plants than they build.

Manufacturing is production plants and the industrial buildings that serve them.

DecliningNortheast
DecliningMidwest
MixedSouth
MixedWest
DesignDeclining
  • AIA's Consensus panel forecasts industrial construction down 11.6% in 2026
  • E2 counts 91 of the 395 clean economy manufacturing projects announced since August 2022 as canceled, closed or downsized, which is 28% of the announced dollars
  • AGC expects canceled and deferred projects to outweigh new starts through 2026

What it means: Owners are announcing more than they finance, so the design work sits with the few programs that reach a budget.

ConstructionDeclining
  • Census has manufacturing construction down 17.0% year over year in September 2026
  • Dodge has manufacturing starts down 21.0% in September 2026 and up 3.4% over the 12 months ending September
  • The 12-month gain comes from a small number of very large plants, not from a broad pipeline

What it means: A handful of very large plants decide whether the year reads up or down. Everything underneath them is falling.

Advanced Manufacturing

Chip plants are falling while drugmakers keep announcing.

Advanced manufacturing is semiconductor fabs, battery plants and pharmaceutical production.

  • Chip and electrical plant construction down 45.2%
  • Eli Lilly, AstraZeneca and Johnson & Johnson keep announcing new US plants
  • 160 semiconductor projects across 30 states since 2020, $828.0B of announced private investment, cumulative rather than year over year
MixedNortheast
MixedMidwest
MixedSouth
MixedWest
DesignMixed

What it means: Awarded at the program level, not project by project.

ConstructionMixed

What it means: Capacity is committed years before the package bids.

Science and Technology

Tenants are moving into buildings that already exist rather than new shells.

Science and technology is laboratory and research space.

  • Lab vacancy 23.8%, a new high
  • Lab space under construction down 44% to 4.5M sq. ft.
  • Core-market demand up 44%
MixedNortheast
DecliningMidwest
MixedSouth
DecliningWest
DesignDeclining

What it means: Conversion and repositioning, not new lab shells.

ConstructionDeclining

What it means: Tenant improvement inside buildings that already exist.

Data Centers

Hyperscalers keep building very large campuses while counties and towns block the smaller ones.

Data centers are the fastest growing sector in this issue and the one facing the most local opposition.

GrowingNortheast
GrowingMidwest
GrowingSouth
GrowingWest
DesignMixed
  • ACEC's engineering executives rate data centers +89 now and +50 twelve months out in the Q3 2026 survey, the highest of the 16 sectors it scores and one of only 2 that improved year over year
  • Deltek puts data centers at 10% of A/E revenue mix, a category it added this year
  • AIA's Consensus panel forecasts the sector up 33% in 2026 and 25% in 2027
  • FMI cut its forecast to up 21.4% from up 35% in January

What it means: Design demand is still the strongest in the issue, and the forecasts are being cut as siting gets harder.

ConstructionMixed
  • CBRE puts vacancy at 1.4%, the lowest it has published, with 80.4% of space under construction already preleased
  • At least 76 cities, counties and towns have moved to pause or ban data centers, and 3 enacted permanent bans
  • Texas paused 250 to 300 projects for an ERCOT audit, and the next interconnection batch does not open until summer 2027
  • Exelon's high-probability data center load fell about 40% between the end of 2025 and the second quarter of 2026

What it means: The very large campuses are still moving. Smaller projects are being blocked at the county and the town level.

Transportation

State DOTs keep letting work while federal authority runs out December 11, 2026.

Transportation is highways, bridges, transit, airports and ports.

  • Awards $165.6B for the 12 months ending July 2026, up 4.4% on the prior 12 months
  • Highway construction up 4.6%
  • Federal authority extended only to December 11, 2026
GrowingNortheast
GrowingMidwest
GrowingSouth
GrowingWest
DesignGrowing

What it means: State DOT programs are the design volume, and federal authority past December 11, 2026 is unsettled.

ConstructionGrowing

What it means: Awards are up 4.4% over 12 months, and state DOT lettings are where that volume moves.

Energy, Power and Grid

Utilities set the schedule that every large-load project works around.

This sector is generation, substations, high-voltage transmission corridors, interconnection and battery storage.

  • Developers plan 86 GW of new generating capacity in 2026 and the queue runs into 2027
  • Investor-owned utilities project $239B of capital spending in 2026, rising again in 2027
  • Power construction is up 11.1% year over year to $191.7B, with the private side up 12.1%
  • The work is substations, transmission interconnection, high-voltage corridors, gas peaking plants, battery storage and solar, concentrated where large loads are landing
  • FERC Order 1920 requires every region to rebuild its long-term transmission plan, with compliance filings running from December 2025 through June 2027
  • Utility delivery dates set the schedule on large-load projects rather than owner dates
FlatNortheast
GrowingMidwest
GrowingSouth
GrowingWest
DesignGrowing

What it means: Substations, transmission interconnection, high-voltage corridors and battery storage are what is being designed, concentrated where large loads are landing.

ConstructionGrowing

What it means: Where the large loads land is where the crews go, and the utility sets the schedule.

04Every Region in Full
Northeast, all 13 sectors
GrowingHealthcare
  • Connecticut: Hartford Hospital unveiled plans for a $950M, 14-story inpatient tower
  • New Jersey: RWJBarnabas won final Department of Health approval for its 15th hospital, $858.7M at Tinton Falls
  • New York: NYU Langone won Brookhaven town board approval on August 27, 2026 for a $650M hospital at Patchogue
MixedHigher Education
  • AIA puts Northeast architecture billings at 39.1 in September 2026, the weakest region in the country
  • Net FTE enrollment FY2014 to FY2024, all 9 states down, median 14.2%, with Massachusetts down 20.6%
MixedCivic and Government
  • State and local construction $74.3B in 2025, up 2.3%, the slowest growth of the 4 regions
  • Public safety up 74.4%, the largest jump in the country. Office down 3.1% and highway down 6.9%
  • 8 of 9 states propose FY2027 general fund increases: Pennsylvania up 5.4%, Connecticut up 4.5%, Maine up 2.4%, Rhode Island up 2.2%, Massachusetts up 2.0%, New Jersey up 1.7%, New York up 1.2%, New Hampshire up 0.6%
  • Vermont proposes down 0.6%, the only cut in the region
MixedOffice
  • New York: Manhattan 11.6%, the lowest of the 10 largest markets, with Midtown prime at 2.2%
  • Massachusetts: Boston rising to 20.7%
FlatRetail
  • Massachusetts: Boston led national net absorption in Q2 2026, on grocery and apparel expansion in the downtown core
GrowingMultifamily
  • Region: residential permit value, buildings of 5 units or more, up 41.0% January to April 2026
  • New York: up 133.4%
GrowingSenior Living
  • Massachusetts: Boston occupancy 94.0%
  • New York: Buffalo active adult occupancy 97.7%
DecliningManufacturing
  • New York: $9.82B announced, 33 projects and $5.17B lost
  • Pennsylvania: $5.03B announced, 13 projects and $1.40B lost
  • New Jersey: $15.04B lost on $0.04B announced
MixedAdvanced Manufacturing
  • New York: Micron, $100B for 4 new fabs at Clay, $4.6B of CHIPS incentives
  • New York: Wolfspeed fab expansion at Marcy, $750M of incentives across both its projects
  • New York: Corning expansion at Canton, $32M
MixedScience and Technology
  • Massachusetts: Boston-Cambridge has 2.1M sq. ft. of the 4.5M under construction
  • Massachusetts: alternative users took 30% of 2025 Boston lab leases
GrowingData Centers
  • New York: Tri-State 190.0 MW of inventory with 13.7 MW available, the smallest of the 8 primary markets
GrowingTransportation
  • New York: among the top 5 states for awards
FlatEnergy, Power and Grid
  • No Northeast state is among the leaders in planned 2026 solar, battery storage or gas
  • Massachusetts and Rhode Island take the region's offshore wind additions
Midwest, all 13 sectors
MixedHealthcare
  • Michigan: Corewell Health plans $1.7B of expansions at Butterworth and Beaumont Troy. $2.6B of Medicaid state-directed payments sit above the new federal limits
  • Illinois: $4.0B above the limits
MixedHigher Education
  • AIA puts Midwest architecture billings at 50.6 in September 2026, the second strongest region
  • Net FTE enrollment FY2014 to FY2024, all 12 states down, median 11.7%, with Illinois down 27.8%
MixedCivic and Government
  • State and local construction $98.9B in 2025, up 5.1%
  • Civic buildings fell while infrastructure rose: office down 6.8% and educational down 6.9%, against transportation up 24.0% and sewage up 9.8%
  • Public safety up 7.6%
  • 5 states propose FY2027 general fund increases of 3% or less: Iowa up 2.8%, Missouri up 1.4%, Illinois up 1.3%, Wisconsin up 1.2%, Indiana up 0.2%
  • 7 propose flat budgets or cuts, from North Dakota flat to Minnesota down 2.3%
GrowingOffice
  • Illinois: Chicago down to 28.3%, the second highest of the 10
FlatRetail
  • Illinois: Chicago among the Midwestern markets with retail construction activity
  • Missouri: St. Louis the same
GrowingMultifamily
  • Region: up 33.5%
  • Rents rising in Chicago, Kansas City and Detroit
GrowingSenior Living
  • Minnesota: Minneapolis occupancy 92.7%
DecliningManufacturing
  • Indiana: $17.44B announced, 8 projects and $3.93B lost
  • Michigan: $16.23B announced, 20 projects and $8.99B lost
  • Ohio: $12.91B announced, 15 projects and $5.89B lost
  • Illinois: $9.00B announced, 9 projects and $5.73B lost
MixedAdvanced Manufacturing
  • Ohio: Intel, $28B for 2 new fabs at New Albany
  • Indiana: SK hynix, $3.87B for advanced packaging and R&D at West Lafayette
  • Minnesota: Polar Semiconductor, $525M at Bloomington
  • Michigan: Hemlock Semiconductor polysilicon plant, $325M of incentives
DecliningScience and Technology
  • No Midwest lab market is named by CBRE or JLL
  • JLL puts the region in the secondary markets, where demand fell nearly 3M sq. ft. over 3 years while available space rose 4.4M sq. ft.
GrowingData Centers
  • Ohio: Columbus vacancy 0.1%
  • Illinois: Chicago 910.6 MW of inventory with 20.0 MW available
GrowingTransportation
  • Illinois: among the top 5
GrowingEnergy, Power and Grid
  • Michigan: 5% of the 43.4 GW of planned 2026 solar
  • Illinois: among the 4 states accounting for almost 60% of planned wind
  • Ohio: among the 5 states accounting for over 80% of planned gas
South, all 13 sectors
MixedHealthcare
  • South Carolina: the Medical University of South Carolina advanced plans for a $1.115B cancer hospital in Charleston
  • North Carolina: Novant approved construction plans above $1B in Wilmington. $3.4B above the limits
  • Kentucky: $3.9B above the limits
  • Texas: $3.5B above the limits
  • Louisiana: $3.3B above the limits
MixedHigher Education
  • AIA puts South architecture billings at 43.1 in September 2026, below the 50 that marks no change
  • Net FTE enrollment FY2014 to FY2024, 11 of 17 states down, median 4.7%, the shallowest decline of the 4 regions
GrowingCivic and Government
  • State and local construction $204.5B in 2025, up 10.0%, the fastest of the 4 regions and 41% of the national total
  • Every civic category rose: office up 22.6%, public safety up 20.8%, educational up 11.9%, amusement and recreation up 24.0%
  • Mississippi proposes 16.4% more FY2027 general fund spending and Arkansas 8.0% more
  • Georgia proposes 12.2% less and Texas 30.5% less, the largest proposed cut of any state, which moves more civic work to county and city issuers
GrowingOffice
  • District of Columbia: down to 21.7%
  • Texas: Houston down to 23.8%, Dallas-Fort Worth down to 25.0%
  • Georgia: Atlanta flat at 25.9%
GrowingRetail
  • Sun Belt markets account for most new retail construction
DecliningMultifamily
  • Region: down 2.8%
  • Texas: down 17.2%, with rents falling in Austin and Houston
MixedSenior Living
  • The region's 65+ population grows 13.7% by 2030
  • Texas: 65+ up 16.4%, Houston occupancy 87.3%
  • Georgia: Atlanta occupancy 87.2%
  • Florida: Miami occupancy 86.5%
MixedManufacturing
  • Texas: $106.29B announced, 79 projects and $29.61B lost
  • North Carolina: $22.93B announced, 16 projects and $2.39B lost
  • Georgia: $20.67B announced, 12 projects and $5.38B lost
  • South Carolina: $18.98B announced, 16 projects and $2.79B lost
MixedAdvanced Manufacturing
  • Texas: Samsung, $45B for 3 new fabs at Taylor and $37B of expansion at Austin
  • Texas: Texas Instruments, $18B for 2 new fabs at Sherman
  • Texas: GlobalWafers at Sherman, $380M of incentives
  • Virginia: AstraZeneca plans $4.5B at its manufacturing facility
MixedScience and Technology
  • North Carolina: Raleigh-Durham among the core markets with rising demand, on biomanufacturing expansion
GrowingData Centers
  • Georgia: Atlanta about 2,900 MW under construction
  • Virginia: Northern Virginia vacancy 0.2%, 10.8 MW available across a 4,496.5 MW market
  • Texas: Dallas-Fort Worth 1,432.8 MW of inventory with 39.6 MW available
GrowingTransportation
  • Texas: among the top 5
  • Georgia: among the top 5
GrowingEnergy, Power and Grid
  • Texas: 40% of planned solar and 53% of the 24 GW of planned battery storage
  • Oklahoma, Tennessee and Florida: among the 5 states accounting for over 80% of planned gas
West, all 13 sectors
MixedHealthcare
  • California: El Camino Health has submitted its application to rebuild Los Gatos Hospital above $1B. $7.4B above the limits, the largest of the 8 states KFF published amounts for
  • Arizona: $3.0B above the limits
MixedHigher Education
  • AIA puts West architecture billings at 50.7 in September 2026, the strongest region in the country
  • Net FTE enrollment FY2014 to FY2024, 10 of 13 states down, median 12.6%, though Arizona rose 21.1% and Utah rose 11.4%
MixedCivic and Government
  • State and local construction $118.7B in 2025, down 1.0%, the only regional decline
  • Educational down 11.9%, highway down 6.4%, office down 2.5%
  • Public safety up 16.5% and health care up 19.5%
  • Montana proposes 10.3% more FY2027 general fund spending, while Nevada proposes 8.5% less and Wyoming 10.2% less
MixedOffice
  • Washington: Seattle down to 28.2%, with prime vacancy at 35.6%
  • California: Los Angeles rising to 25.8%
FlatRetail
  • California: Los Angeles led national net absorption alongside Boston
MixedMultifamily
  • Region: up 20.4%
  • Oregon: up 91.7%
  • Colorado: up 55.0%
  • California: up 47.7%
  • Washington: up 37.6%
  • Utah: down 17.5%
  • Arizona: down 30.6%
  • Idaho: down 43.7%
  • Nevada: down 65.9%
GrowingSenior Living
  • California: San Francisco occupancy 93.3%, Los Angeles and San Diego active adult 97.4%
  • Arizona: Phoenix active adult 88.7%
MixedManufacturing
  • California: $28.09B announced, 21 projects and $3.05B lost
  • Arizona: $26.51B announced, 7 projects and $2.26B lost
  • New Mexico: $18.50B announced, 4 projects and $2.86B lost
  • Nevada: $14.56B announced, 10 projects and $8.58B lost
MixedAdvanced Manufacturing
  • Arizona: TSMC, $65B for 3 new fabs at Phoenix
  • Arizona: Intel, $32B for 2 new fabs and a modernization at Chandler
  • Idaho: Micron, $25B for 1 new fab at Boise
  • Arizona: Amkor, $1.7B at Peoria
DecliningScience and Technology
  • CBRE attributes the negative national absorption to occupancy declines in West Coast markets
  • JLL puts vacancy across Boston, San Diego and the Bay Area together at 32%
GrowingData Centers
  • Arizona: Phoenix 1,069.2 MW of inventory with 12.1 MW available
  • California: Silicon Valley 509.2 MW with 21.2 MW available
  • Oregon: Hillsboro 491.4 MW with 1.1 MW available
GrowingTransportation
  • California: among the top 5
GrowingEnergy, Power and Grid
  • California: 14% of planned battery storage and 6% of planned solar
  • Arizona: 13% of planned battery storage and 6% of planned solar
  • New Mexico and Wyoming: among the 4 states accounting for almost 60% of planned wind
05Want More

If a signal in this issue surfaced a question about your firm's specific market position: that is exactly the conversation TFP has with clients. Reply to this email or book a call at theflamingoproject.com/contact.

The Pink Signal arrives by email, free, 4 times a year. Subscribe and tell us what to watch for your firm: 3 questions, at theflamingoproject.com/the-pink-signal. We read every response and it shapes what goes into the brief.

Research reported as of November 2, 2026. Sources.

  • Census New Residential Construction, September 2026, released October 20, 2026
  • Census construction spending, September 2026 data, released November 2, 2026
  • Gordian State of Facilities in Higher Education, 13th edition, April 2026
  • Census building permits by state, January to April 2026
  • AIA and Deltek Architecture Billings Index, September 2026, released October 21, 2026
  • Dodge Momentum Index, September 2026, released October 7, 2026
  • AGC analysis of BLS employment and Job Openings and Labor Turnover Survey data, Data DIGest, week of September 28 to October 2, 2026
  • SHEEO State Higher Education Finance, FY2014 to FY2024
  • NASBO Fiscal Survey of States, Spring 2026
  • National League of Cities on municipal bonds and city infrastructure, July 16, 2026
  • Census Value of Construction Put in Place, State and Local and Federal monthly series, September 2026 data, and State and Local by Census region, annual 2025 against 2024
  • CBRE office, July 29, 2026
  • CBRE retail, July 29, 2026
  • CBRE life sciences, July 31, 2026
  • CBRE data centers, August 27, 2026
  • JLL life sciences, June 9, 2026
  • NIC, October 1, 2026
  • KFF, August 14, 2026
  • Becker's Hospital Review, September 29, 2026
  • EIA, February 20, 2026
  • FERC Order 1920 compliance filings schedule, August 19, 2026
  • Semiconductor Industry Association chip supply chain investments, September 22, 2026
  • E2 Clean Economy Works, July 20, 2026
  • ERCOT, July 29, 2026
  • AEP, July 30, 2026
  • ISO New England, May 18, 2026
  • California Energy Commission data center page, 2026
  • ARTBA, August 28, 2026
  • NMHC, July 23, 2026
  • Esri county senior population, 2025 and 2030
  • AIA Consensus Construction Forecast, July 21, 2026
  • ACEC Research Institute Engineering Business Sentiment, Q3 2026, published August 24, 2026
  • Deltek Clarity A&E Industry Study, 47th annual, May 12, 2026
  • JLL U.S. Office Market Dynamics, Q3 2026, October 13, 2026
  • Colliers U.S. Retail Market Statistics, Q3 2026, October 12, 2026
  • National League of Cities Data Center Local Action Tracker, August 2026
  • Cushman and Wakefield U.S. Industrial MarketBeat, Q3 2026, October 11, 2026
  • Dodge Construction Network, Construction Starts Recede 1.5% in September, October 21, 2026
  • E2 Clean Economy Works, Q1 2026 analysis memo, May 2026
  • Marcus and Millichap, U.S. Retail Real Estate Outlook 2026, August 2026
  • Welltower, third quarter 2026 results, October 26, 2026
  • Ventas, third quarter 2026 results, October 27, 2026

Every figure above names its publisher and its date.

The Pink Signal is general market commentary from The Flamingo Project, LLC. It is not legal, financial, or other professional advice, and it is not tailored to your firm. Research for this issue is AI-assisted and human-reviewed, and it draws on third-party sources that a publisher may revise after this issue publishes. Forecasts and outlooks will change. Verify any figure you plan to act on against the cited source. Design and construction run on different scales and are not directly comparable. Full Terms of Use and Disclaimer: theflamingoproject.com/pink-signal-terms